Follow us

© 2022 «INCAS» Privacy Policy
22/01/2023

RELANSIN

  • MODELING AND SIMULATION OF COMPLEX REQUEST BEHAVIOR OF COMPOSITE MATERIALS WITH APPLICATIONS IN THE AERONAUTICS INDUSTRY – MOSCOM Contract no. 202/20.07.2006 Project manager: UPB-CCMA – Bucharest (Project director: Dan Mihai CONSTANTINESCU. P1 partner: INCAS (project manager Marcel D .STERE) – mode I

  • INTEGRATED TECHNOLOGICAL PLATFORM OF ELECTROCHEMICAL ENGINEERING OF SURFACES FOR ADVANCED MATERIALS; APPLICATIONS IN THE FIELD OF EVALUATING THE INTEGRITY AND RELIABILITY OF STRUCTURES – ELSURFSTRUCT. Contract 255/ 11.09.2006 Project leader: Autonomous Directorate for Nuclear Activities – Pitesti Nuclear Research Branch (SCN Pitesti) (Project director: Victor ANDREI. P5 partner: INCAS (project manager Marcel D.STERE) – module I

  • HYBRID ASSEMBLIES WITH ADHESIVES AND RIVETS TO STRUCTURES FROM COMPOSITE MATERIALS AND ALUMINUM ALLOYS – ADENITE. Contract no. 262 / 12.09.2006 Project manager: UPB-CCMA (Project manager: Marin SANDU Partner P1: INCAS (Project manager Marcel D.STERE) – module I

  • Technology for non-destructive measurement of the noxes emitted in the ambient environment by thermal machines – TEHMANOX. Contract no. 85/03.10.2005 Project co-donor: OPTOELECTRONICA 2001 S.A. (Project director: Brindus COMANESCU) Project partner: INCAS (Project manager. Paula COPAESCU) – module I

  • Integrated technologies in order to obtain multilayer structures resistant to high temperatures, erosion and contact with liquid metal for special purpose (STECUSID) Project 268. Project co-donor: CEMS – UPB (Project director: Georgeta COSMELEATA) Project partner: INCAS (Project manager. Victor MANOLIU) – mode I

  • ADVANCED TECHNOLOGIES FOR THE DEVELOPMENT OF ECOLOGICAL ANTI-FRICTION COATINGS METAL-CARBON-TEHMEC- Contract no. 237/21.07.2006. Project manager: INFLPR-Bucuresti (Project director: Dr.fis. Cristian P.LUNGU.Partner P2:INCAS (Project manager: Eng. Gheorghe IONESCU) – module I

  • RESEARCH INCREASING THE RELIABILITY OF COGENERATIVE GROUPS AND REDUCING PRODUCTION COSTS BY INCREASING THE DEGREE OF AUTOMATION AND ALIGNMENT WITH EUROPEAN COMMUNITY STANDARDS-COGENEX- Contract no. 274/P4/12.09.2006. Project leader: INCDT -COMOTI-Bucharest (Project director: Dr. Eng. Cristian CARLANESCU. Partner P4: INCAS (Project manager Eng. Gheorghe IONESCU) – module I

Access the old site